GET A QUOTE / BROCHURE
PARTIAL DISCHARGE TESTING
PD Testing Services can be classified in two parts :-
1) The method utilized for the detection of partial discharge is as follows:
- Acoustic : Band Width- 20kHz – 300kHZ
- TEV ( Transient Earth Voltage) : Band Width – 3MHZ-100 MHZ
- UHF ( Ultra High Frequency) : Band Width – 300MHZ- 1500MHZ
- HFCT ( High Frequency Current Transformer) : Band Width – 500kHz – 50 MHZ
- Ultrasonic : Band Width – 40kH
2) Furthermore, we provide continuous partial discharge monitoring services with the objective of:
- The PD monitoring is continuous 24/7.
- The data resolution and sample rate are both high.
- The data is centralized for easier management.
- The PD data analysis and alarms are automatic.
- The configuration is bespoke and based on project requirements.
3) PD Localization and Pin Pointing
- It included result analysis and pinpointing of PD in Switchgear Panel.
FEATURED
Why Choose Us?
Industris Manufacture is committed to helping its clients reach their goals, to personalising their event experiences, to providing an innovative environment, and to making a difference.